Downtown Allen Park - Retro Feel.  Timeless Appeal.
About the Downtown Green Graphic Business Resources Green Graphic Project Highlights Green Graphic Events
 Green Graphic Links Green Graphic Search Green Graphic Site Map Green Graphic Contact Us Green Graphic Home Green Graphic Email List


Burgundy Line

 
Business Resources
Overview  |  Building Design Standards  |  Facade Grant Program 
Market Analysis

Facade Grant Program

Program Statement

To utilize tax increment revenues available to the Allen Park Downtown Development Authority to revitalize building components of commercial buildings in the business district consistent with Building Design Standards and criteria adopted by the Downtown Development Authority.

For a listing of PreQualified Architects, click here.

Purposes of the Program:

  1. To directly stimulate design improvements to business district buildings consistent with Building Design Standards.

  2. To assist with building improvements sensitive to the unique context of the business district’s commercial architectural character.

  3. To encourage physical improvements to businesses to make them attractive to Allen Park’s consumer market.

  4. To encourage adaptive reuse and creative projects which add to the economic diversity of the Allen Park business district.

Program Description

Architectural Services

The DDA will reimburse up to four (4) hours of time to consult with an architectural firm, from a preapproved list, that is familiar with revitalization of older buildings and knowledgeable of historic preservation and the Building Design Standards, IF the application is successfully approved.

Additionally, the DDA, at no cost to the applicant, will provide for a one-hour in-office consultation with a pre-qualified architect to discuss compliance with the Standards and preliminary ideas for the building.

Building Design Standards

Program applicant and applicant’s architect shall consult and utilize building façade criteria specified in the Building Design Standards.

If the building possesses unique conditions not fully addressed in the design criteria, then the DDA Planner and DDA Architect shall review the conceptual designs and methods for construction and make a determination on their acceptability.

Facade Easement

Program applicants or the property owner, if not one and the same, shall execute and deliver a façade easement in a form provided by the Allen Park DDA.

The term of the façade easement shall be 5 years. The applicant shall be required to name the Allen Park DDA as an additional insured on its liability insurance policy for the façade only.

Grant Terms:

A minimum of three matching grants will become available on July 1 of each fiscal year the program is budgeted. The Board will review each applicant on a case-by-case basis.

Matching grant payments will be made in the form of reimbursement upon completion of the improvement in a manner acceptable to the Authority and acceptance by the appropriate municipal authorities.

Standards for Grant Decisions:

  1. Applicants for grant projects must be located within the boundaries of the DDA district. Tenant applicants are required to submit written evidence of building owner approval of the application for funds dealing with improvements to the building.

  2. Grants will not be considered for residential property, national franchises, or tax exempt properties.

  3. All proposed façade improvements are to be approved by the DDA Board. Applicants who deviate from the approved application may be disqualified from the program.

  4. All building improvements must meet City of Allen Park building department and zoning code requirements.

  5. Improvements to buildings must meet the minimum guidelines for rehabilitation outlined in the Building Design Standards.

  6. Maximum matching grant amounts will be $10,000.00 per if each façade fronts an alley or other public or semi-public space, Or, per building or separate leaseable space divisible by a common wall.

  7. Examples of ELIGIBLE and INELIGIBLE activities are as follows:
    Eligible improvements include, but are not limited to:

    • Demolition of Inappropriate façade
    • Window Repair and Installation
    • Masonry Work
    • Removal on Non-compliant Signs
    • Installation of Compliant Signs (those which require a sign variance are ineligible)
    • ADA Compliance

    Inelgible improvements, unless in conjunction with eligible improvements included above, are as follows:

    • Awnings
    • Painting
    • Roof Repairs
    • Energy Conservation
    • Normal Building Maintenance

Grant Policy:

In addition to the guidelines and standards stated above, the DDA Board shall evaluate grant applications with the following policies in mind:

  1. Program Impact: The grant program boundaries include a substantial number of buildings and it is recognized that improvements to one structure may not have as great an impact on the business district as improvements to another.

  2. Project Area Impact: Consideration will be given to those applicants who elect to improve both the front (street) and the rear (parking lot) facades of the building.

  3. Applications will not be considered for work already complete.

  4. The DDA will annually establish a budget for the amount of funds they will commit to the grant program

Considering that the total program is limited, it is the intent of the Board to provide the business district with the greatest impact possible consistent with the Building Design Standards.

The DDA Board reserves the right to reject an application for a building which, in the Board’s evaluation, is in an advanced state of deterioration so that the proposed investment is at best a stopgap measure against imminent demolition.

Program Implementation:

Marketing:

The Allen Park DDA will inform the building owners and tenants, and the community as to availability and benefits of the grant program. Examples of acceptable marketing techniques would include: media advertisements, a brochure and meetings with individuals as necessary.

Application Process

  1. Applications for the program will be available at the Office of the Allen Park Downtown Development Authority.

  2. The application packet will include an application, program description, the Building Design Standards and examples of required documents.

  3. The Applicant can meet with the DDA Director to review the preliminary scope of work to ensure consistency with Building Design Standards.

  4. The DDA Director will review the application only after all necessary information has been submitted in a neat and thorough fashion. The Director reserves the right to reject incomplete or illegible applications.

  5. The Director will forward the application to the full Board of the Allen Park Downtown Development Authority for review. If approved, the grant amount awarded is final. Requests to increase grant funding will not be accepted.

  6. If denied, the Director will explain within 30 days, in writing, to the applicant the reasons for rejection and what, if any, steps can be taken to receive approval.

  7. If the Board rejects the application, the applicant has the option of reapplying.

Post Application Procedure

  1. The property owner will be responsible for ensuring that any work done is consistent with the program and the design as approved. The Director will be available for consultation and to provide clarification of the Board’s intent.

  2. The Director must approve any changes in work. Action on changes may be deferred to the DDA Board.

  3. The Director shall note all approved changes in work at the bottom of the application.

  4. Agents of the Board will conduct periodic inspection to ensure compliance with technical specifications. All work must pass applicable city inspections.

  5. The Director will conduct a final inspection before reimbursement will be made. The contractor will provide a waiver of lien to the Authority. Copies of all invoices, paid in full, are necessary to process a reimbursement.

  6. Deviations from an approved plan may disqualify the applicant from the grant program. In case of disqualification, the applicant will forfeit all rights to reimbursement.

  7. The project must be completed within six months of the beginning of construction.

Amendments to the Program:

The DDA Board may amend the details of the grant program by majority vote.

Forms Available

Facade Application Checklist Easement Application
Facade Grant Program Application Full Unconditional Waiver

Pre-Qualified Architects

Cooper Design

2900 Brockman Boulevard

Ann Arbor MI 48104

Contact: Gary Cooper

734-769-7007

Hourly Rate: $90.00/Hour/Principal

"We specialize in working with existing buildings, particularly building facades. The character of the existing, or original structure, is the basis for all our work. We let the original character of the façade guide any façade design."

 

Hamilton Anderson Associates

1435 Randolph Suite 200

Detroit MI 48226

Contact: Kent Anderson

313-964-0270

Hourly Rate: $160.00/Hour/Principal

"We take pride in developing creative and responsible solutions for such projects."

 

John Dziurman Architects

1000 W. University Drive Suite 315

Rochester MI 48307

Contact: John Dziurman

248-608-0300

Hourly Rate: $95.00/Hour/Principal

"…brings to this assignment a project team with extensive background and experience with design guidelines for historic and older buildings and structures throughout the state, including creating the new Building Design Standards for downtown Allen Park…"

 

 

About the Downtown  |  Business Resources  |  Project Highlights  |  Events  |  Links
Search  |  Site Map  |  Contact Us  |  Email List  |  Home

Allen Park DDA
6543 Allen Road
Allen Park, MI  48101
313-928-0940

If you are experiencing technical problems with our website, please report them here.
This page last modified 01/01/08 .
All information © 2008 Allen Park Downtown Development Authority
Site Design/Development by
Municipal Web Services...Bringing the World to Your Corner of the World.  Click here to go to the Municipal Web Services website.
Logo design by
New Moon Visions

This website contains links to Adobe Acrobat PDF documents.  If you have trouble viewing these documents, click here to download the free Adobe Reader.
Adobe Reader icon.  Click here to download the Adobe Reader.

Site Use Policy